Refer to Running Global Projects -
Introduction for further information about Global projects.
The project sites are called Locations. One of the locations, called the
Hub, will have overall responsibility for the administration of the project. The other locations are called
Satellites.
There are two levels of administration required: hub administration and
local administration. Local administration tasks need to be carried out at the hub and the satellites. This guide is written for administrators at all locations, although the distinctions between hub and satellite administration are also explained.