ISODRAFT User Guide

Piping Components in ISODRAFT : Pipe Ends and Connections
Full E-W, N-S and elevation (EL) coordinates will be listed for the start and finish of each Pipe. They will also be listed at the end of every Tee off-line branch; in other words, at all connection points.

1974 to current year. AVEVA Solutions Limited and its subsidiaries. All rights reserved.
AVEVA Logo