If equipment is repositioned using ordinary positioning commands, the pipes connected to it do not automatically move with the item. The DRAG command is used to move Constrained Networks of Piping, Equipment and Nozzle elements all together. How the constrained network is created depends on the direction of the dragging operation and the type of item being dragged.