Schematic Model Manager
User Guide
Appendices
:
Appendix F: P&ID Status Control in Schematic Data Model Management
:
P&ID Status Control - An Example
: How to Check Connectivity from P&ID to P&ID
How to Check Connectivity from P&ID to P&ID
From the displayed graphic view of the diagram, zoom into an off page connector.
Clicking on the Off Page Connector will make the corresponding schematic element the current element, and highlight it in the Schematic Explorer, if it is open.
Right-click on the Off Page Connector on the diagram and select
Go to Connected OPC
.
The diagram containing the connected OPC will be opened and the relevant OPC highlighted.
Once the diagrams have been checked, drafting errors corrected and the diagrams re-imported, the diagrams are ready to be moved to Rev B using the status controller.
Using the status history we can view the diagrams transition so far through the status control process which has been defined. This history is based on session data, so some transitions which occurred during one session will not be shown.
Diagram 5540021-001 requires revision and must be returned to Rev A.
Using the status controller, the status of this diagram is changed. The valid status transitions defined in the status definitions are shown to prevent an inappropriate status transition from being selected.
After revision and re-import, the diagram may now be promoted back to a status of Rev B. This must be done before it can make the transition to Rev 0.
All diagrams are now validated and Approved for Design.
Again using the status controller the status of the diagrams is changed.
1974 to current year.
AVEVA Solutions Limited and its subsidiaries. All rights reserved.