If this option is ticked, the shapes on a newly created drawing are refreshed during the Save As operation. It will make the operation take longer, but all the texts on all the shapes will be updated.
When the appropriate options are selected click OK. The drawing is duplicated and all DB items it contains are copied according to the settings from the dialog. The progress of the copy operation is presented in the
Progress Bar in the application window. The information about all subsequent steps is also saved in the Diagrams
Message Log: